About Us

About Our Company

The refinery accepted its first shipment of crude oil in March 2011. The first batch of oil products was sold in April of that year.

The first stage of the refinery has an installed capacity of 150 thousand tons per year for processing oil. The CDU-AT-2 installation’s construction and installation work were finished in 2014. The plant’s capacity increased to 300,000 tons annually as a result.

All manufactured goods are accredited by the Republic of Kazakhstan’s national technical regulating system.

The amount of crude oil processed by “LLP Petrochina International Kazakhstan”. since 2011 is 545.2 thousand tons.

The company’s top aims include raising the standard of the products it offers and growing its geographic reach.

The firms currently employ 168 people, with an average age of 30-35. Employee earnings climbed by 30% from the previous year and were higher than the regional average. The company has established all ideal conditions for employees to function effectively.

OIL3

Who We Are

One of the most economically promising regional cities in Kazakhstan is Aktobe, which is home to the oil refinery “LLP Petrochina International Kazakhstan”

In March 2011, the refinery received its initial delivery of crude oil. In April of that year, the first batch of oil products was sold.

The refinery’s first stage can process 150 000 tons of oil annually at installed capacity. 2014 saw the completion of the building and installation phases of the CDU-AT-2 installation. As a result, the plant’s yearly capacity rose to 300,000 tons.

Our Global Partners

We Excel at What We Do.

0 %
High Quality
0 %
Best Performance
0 %
Top Team